The Hai Duong 28 dredger was constructed by the joint venture of Vu Hai Shipbuilding and Repair Services Co., Ltd., and Bach Dang Shipbuilding Industry Corporation. After six months of construction, the Hai Duong 28 dredger was completed and handed over to the investor, Hai Minh Long Construction and Trading Co., Ltd.
This cutter suction dredger has a capacity of 3,600 HP, a mixed pumping capacity of 7,000 m³/h, a maximum dredging depth of 18 meters, and a CSD650 pipe diameter. All dredged materials are pumped through a pipeline directly to the shore within a radius of up to 6 km. The Hai Duong 28 can dredge, maintain, and reclaim in complex terrains, weak soil foundations, and under severe weather conditions, meeting international standards.
Notably, as of now, the Hai Duong 28 is the largest capacity cutter suction dredger built in Vietnam, with quality comparable to products from advanced countries.
Speaking at the ceremony, Ms. Tran Thi Hong Nhung, Director of Hai Minh Long Construction and Trading Co., Ltd., affirmed that the construction industry for waterway projects in Vietnam and worldwide is experiencing a strong and promising development phase, with a high demand for construction vessels to keep up with government and business investments in expanding and maintaining port infrastructure in Vietnam and neighboring countries.
Recognizing this development potential, Hai Minh Long Construction and Trading Co., Ltd. boldly invested in the Hai Duong 28. In the future, we aim not only to undertake waterway construction projects but also to research and provide construction vessels for the domestic market and neighboring countries in the near future.
With the Hai Duong 28, Hai Minh Long Construction and Trading Co., Ltd. embarks on a journey to realize its vision of constructing waterway projects and providing construction vessels for the domestic and neighboring markets. We expect that after Hai Duong 28, Hai Minh Long will grow, eventually possessing a fleet of dozens, even hundreds, of high-quality construction vessels with greater functionality, capacity, and size, meeting the diverse requirements of large projects domestically and internationally, helping Hai Minh Long rapidly grow and expand.
Source: Quang Ninh Online Newspaper